<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/1_Setting_up_MDF_jig_to_plank_over_MBM.jpg"><h2>1 Setting up MDF jig to plank over MBM.jpg</h2>Setting up MDF jig to plank over<br><img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/2_MDF_Jig_complete_ready_for_planking.jpg"><h2>2 MDF Jig complete ready for planking.jpg</h2>MDF jig ready for planking<br><img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/3_Foam_strip_planking_being_applied.jpg"><h2>3 Foam strip planking being applied.jpg</h2>Foam strip planking being applied<br><img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/4_Foam_strip_planking_being_applied.jpg"><h2>4 Foam strip planking being applied.jpg</h2>Foam strip planking being applied<br><img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/5_Foam_strip_planking_being_applied.jpg"><h2>5 Foam strip planking being applied.jpg</h2>Foam strip planking being applied<br><img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/6_Foam_strip_planking_being_applied.jpg"><h2>6 Foam strip planking being applied.jpg</h2>Foam strip planking being applied<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/7_Foam_strip_planking_nearing_completion.jpg"><h2>7 Foam strip planking nearing completion.jpg</h2>Foam strip planking nearing completion<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/8_Bow_cone_keel_and_risers_being_fitted_to_hull.jpg"><h2>8 Bow cone, keel and risers being fitted to hull.jpg</h2>Bow cone, keel and risers being fitted to hull<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/9_Being_profiled_ready_for_laminating.jpg"><h2>9 Being profiled ready for laminating.jpg</h2>Being profiled ready for laminating<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/10_Transom_ready_fro_laminating.jpg"><h2>10 Transom ready fro laminating.jpg</h2>Transom ready for laminating<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/11_Transom_being_laminated.jpg"><h2>11 Transom being laminated.jpg</h2>Transom being laminated<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/12_Transom_laminate_under_vacuum.jpg"><h2>12 Transom laminate under vacuum.jpg</h2>Transom laminate under vacuum<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/13_Transom_laminate_complete.jpg"><h2>13 Transom laminate complete.jpg</h2>Transom laminate complete<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/14_Port_side_of_hull_under_vacuum_after_laminating.jpg"><h2>14 Port side of hull under vacuum after laminating.jpg</h2>Port side of hull under vacuum after laminating<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/15_Port_side_of_hull_under_vacuum_after_laminating.jpg"><h2>15 Port side of hull under vacuum after laminating.jpg</h2>Port side of hull under vacuum after laminating<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/16_Hull_bottom_laminate_complete_with_vacuum_bag_removed_and_peel_ply_still_in_place.jpg"><h2>16 Hull bottom laminate complete with vacuum bag removed and peel ply still in place.jpg</h2>Hull bottom laminate complete with vacuum bag removed and peel ply still in place<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/17_Hull_bottom_laminate_complete_with_vacuum_bag_removed_and_peel_ply_still_in_place.jpg"><h2>17 Hull bottom laminate complete with vacuum bag removed and peel ply still in place.jpg</h2>Hull bottom laminate complete with vacuum bag removed and peel ply still in place<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/19_Hull_exterior_lamination_complete_with_peel_ply_covering_MBM.jpg"><h2>19 Hull exterior lamination complete with peel ply covering MBM.jpg</h2>Hull exterior lamination complete with peel ply covering<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/20_Hull_exterior_lamination_complete.jpg"><h2>20 Hull exterior lamination complete.jpg</h2>Hull exterior lamination complete<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/21_Removal_of_interior_frames_for_laminating.jpg"><h2>21 Removal of interior frames for laminating.jpg</h2>Removal of interior frames for laminating<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/22_Removal_of_interior_frames_for_laminating.jpg"><h2>22 Removal of interior frames for laminating.jpg</h2>Removal of interior frames for laminating<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/23_Transom_door.jpg"><h2>23 Transom door.jpg</h2>Transom door<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/24_Laminating_interior_skin.jpg"><h2>24 Laminating interior skin.jpg</h2>Laminating interior skin<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/25_Engine_leg_cutout.jpg"><h2>25 Engine leg cutout.jpg</h2>Engine leg cutout<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/28_Bow_thruster_tube_fitted.jpg"><h2>28 Bow thruster tube fitted.jpg</h2>Bow thruster tube fitted<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/29_Sanding_hull_ready_for_primer.jpg"><h2>29 Sanding hull ready for primer.jpg</h2>Sanding hull ready for primer<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/30_Primer_being_applied.jpg"><h2>30 Primer being applied.jpg</h2>Primer being applied<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/31_Primer_being_applied.jpg"><h2>31 Primer being applied.jpg</h2>Primer being applied<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/31_Setting_up_internal_structure.jpg"><h2>31 Setting up internal structure.jpg</h2>Setting up internal structure<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/32_Primer_being_applied.jpg"><h2>32 Primer being applied.jpg</h2>Primer being applied<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/33_Primer_applied.jpg"><h2>33 Primer applied.jpg</h2>Primer applied<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/34_Primer_applied.jpg"><h2>34 Primer applied.jpg</h2>Primer applied<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/35_Primer_applied.jpg"><h2>35 Primer applied.jpg</h2>Primer applied<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/36_Internal_structure_in_position.jpg"><h2>36 Internal structure in position.jpg</h2>Internal structure in position<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/37_Internal_structure_being_laminated.jpg"><h2>37 Internal structure being laminated.jpg</h2>Internal structure being laminated<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/38_Primer_being_abraded_ready_for_filler.jpg"><h2>38 Primer being abraded ready for filler.jpg</h2>Primer being abraded ready for filler<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/Dale_34.3_21022012.jpg"><h2>dale</h2>The finished product<br><img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/73_Hull_being_turned_over.jpg"><h2>Hull-being-turned-over</h2>Hull being turned over<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/99_Deck_truned_over_and_primer_applied.jpg"><h2>Deck-truned-over-and-primer-applied</h2>Deck turned over and primer applied<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/90_Hull_with_silver_stripes.jpg"><h2>Hull-with-silver-stripes</h2>Hull with silver stripes<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/101_Engines_fitted.jpg"><h2>Engines-fitted</h2>Yanmar drives fitted<img src="http://www.mby.com/wp-content/uploads/sites/18/2012/03/102_Engines_fitted.jpg"><h2>Engines-fitted</h2>Yanmar Engine installation